Whats Happening ?

Bits and pieces but work progresses.

Operating the Rb22 while Trevor directs, Adrian lowers the two  most recently cast coping blocks onto the top of the wharf wall.  Adrian parks the crane and then he and Trevor settle the blocks into place and level them using crow bars and levers.  Trevor mixes a load of concrete and fills the void beneath the blocks while Adrian sorts facing stone to fill the front gap.  While they are involved in this Carol and David arrive.  Carol sets about applying a coat of bitumastic paint to the paddle blades of the weed-cutting boat and David works on extending the scaffold platform along the wharf wall.  Carol and David are only able to put in a short day and have to leave early so Trevor and Adrian spend the remainder of the afternoon removing debris from the next section of wharf wall to be rebuilt.