Whats Happening ?

24th July 2009

Trevor and Adrian dismantle the section of scaffolding standing at the entrance to the lock chamber on the eastern wall.  There is still a lot of repair that is required to finish this wing but the scaffold is preventing Michael from clearing the silt beneath it..