Trevor, Barry and Adrian continie working on the lead tub-bot construction. While Barry sets the joints between the bow and side-chines Trevor and Adrian bore and countersink hole through which bolts will pass to hole the joints firm.Barry then sets out the positions where mortise sockets have to be cut to accommodate the rib posts. […]