Norman helps Adrian to dry-lay 2 coping ‘stones’ and they then begin dismantling a section of scaffold finished with revealing the newly topped length of wharf wall. It looks really good!
Trevor and Adrian remove the mould from the coping ‘stone cast the day before. They then distress the face and top surface before reassembling the mould and casting another block. Following this they spend time digging silt from the pile and using it to level parts of the site.