Whats Happening ?

Getting it all together.

Trevor and Adrian sort through the stacks of boards that have been cut from the redundant balance beams and select ones suitable to cover bottom of the new tub-boat.  Whilst they now have a large stock of timber, a lot of it is suffering from splits and rot or have bolt holes running through them.  All the boards will require edging and planing along their lengths but first Trevor and Adrian need to know that they have a sufficient  number of good boards for the job in hand.  By the end of the day they have laid out enough boards to cover the base and have begun cutting them roughly to the length required.