Whats Happening ?

Saturday Febuary 6th

Alistair operates the RB22 to lift and relocate the gates so that he can get the crane in a better position to lift into position the bridge, Adrian and Norman assist by pulling on ropes attached to each bottom corner

He then lifts and manoeuvres the bridge itself into position.