Whats Happening ?

Saturday March 20th

Alistair, Adrian, Trevor and Barry prepare to lift a gate into place whist Neal makes a video record. Alistair drills holes and sets bolts into the top of the quoin stones and attaches the brackets which the collars will be locked into.   He and Barry then set about attaching the collars to the tops of the gates but this requires a reduction of the timber where collar turns.

The next job is to cut a recess in the timber which forms the cill in order to locate new cups.