As previously arranged, a contractor arrives at Sea Lock with a large, portable planking saw. He has to spend some time to build a temporary gig for the saw to travel along in order cut the Oak beam to the correct size and angle required to repair the damaged gate-stops. Eventually everything is completed satisfactorily. Lowering the timbers into the lock chamber is the next task.