Whats Happening ?

The bees keep at it!

A change in the weather has brought more activity to the Sea Lock Site again today.  Neither Trevor nor Adrian are available but Barry has arrived with Carol and between them they set about fixing in place the last two boards to the port and starboard sides of the butty boat.  They then begin fitting elbows to one end.  In the meantime John and Wesley mark out sections to be cut out of the rusty floor from the paddle boat.  John uses the large angle grinder to remove the first section.  It’s a heavy beast to hold-up whist cutting vertically down.  Sheets of new metal have already been delivered but it will a while before a new floor can be welded on.  Bob continues clearing mud from the wharf basin and water is running fast and smoothly through it cutting a nice deep channel.